Progress reports have several important functions; they:
Time periods. A progress report usually summarizes work within each of the following:
Project Individual tasks Building municipal Measuring community interest ball parks on city- Locating suitable property owned land Clearing the property Designing the bleachers, fences, etc. Writing a report Studying the assignment Selecting a topic Identifying the audience of the report Narrowing the topic Developing a rough outline Gathering information Writing one or more rough drafts Documenting the report Revising and editing the report draft Typing and proofreading the report Putting the report in its final packageReport topics. You can also organize your progress report according to the work done on the sections of the final report. In a report project on cocombusting municipal solid waste, you would need information on these topics:
Topics to be covered in the final report 1. The total amount of MSW produced --locally --nationally 2. The energy potential of MSW, factors affecting itsFor each of these topics, you'd explain the work you have done, the work you are currently doing, and the work you have planned.
energy potential 3. Costs to modify city utilities in order to change to
cocombustion
A progress report is a combination of two of these organizational strategies. The following outline excerpts give you an idea of how they combine:
Progress report A Progress report B Progress report C Task 1 Work Completed Topic 1 Work completed Task 1 Work completed Current work Task 2 Current work Planned work Task 3 Planned work Task 2 Current Work Topic 2Figure 3-6 shows an example of the project-tasks approach with subheadings for time periods; Figure 3-7 shows the time-period approach with subheadings for report topics.
Work completed Task 1 Work completed Current work Task 2 Current work Planned work Task 3 Planned work Task 3 Current Work Topic 3 Work completed Task 1 Work completed Current work Task 2 Current work Planned work Task 3 Planned work
Brine Drainage Tube Modifications During this period, we have continued to work on problems associated with the brine drainage tubes. Previous period. After minor adjustments during a month of operation, the drainage tubes and the counterwasher have performed better but still not completely satisfactorily. The screen sections of these tubes, as you know, are located at variable distances along the height of the washer. Current period. The screen portion of the brine drainage tubes have been moved to within 5 feet of the top of the pack. So far, no change in counterwasher performance has been observed. Production statistics at the end of this month (February) should give us a clearer idea of the effect of this modification. Next period. Depending on the continued performance of the screen in its current position in relation to the top of the pack, we may move the screen to within 3 feet of the top of the pack in the next period of testing. Although the wash ratio was greater with greater screen height, the washing efficiency seems to remain relatively constant as the production vs. compressor KW data for all screen locations so far has seemed to follow the same linear curve.
WORK COMPLETED As of this time, I have completed almost all of the research work and am putting the sections of the final report together. Here is a breakdown of the work that I have dione so far. Development of the Bottle In the development section of my report, I have written a technical descrip- tion of a typical PET soft-drink bottle. It is very complete and gives the reader a good idea of what the product should look like and able to accomplish. Favorable Properties The section of the report describing the properties of PET is finished. I have chosen four physical properties that many raw materials containers are tested for, and I have shown how PET withstands these tests. Manufacturing Processes For the section on manufacturing processes, I have done research to help me recommend one particular production method for PET bottles. Here, I have described this chosen method and have explained exactly how a plastic bottle is produced on an assembly line. Economics I have finished work on half the economics section of this report. So far, I have written an econimic comparison of the use of plastic and glass bottles. PRESENT WORK Right now I am mainly involved in determining just which areas of my report are lacking information. Also, I am continuing my work in locating financial information on PET bottles. Manufacturing Processes In the manufucaturing section, I am currently . . .
Introduction. Review the details of your project's purpose, scope, and activities. This will aid recipients who are unfamiliar with the project, who do not remember certain details, or who want to doublecheck your approach to the project. The introduction can contain the following:
I am now submitting to you a report on the progress that I have made on my research for your company, Ginseng Cola. Immediately following the January 15 acceptance of my firm's bid to study the advantages of bottling your soft-drink product in plastic bottles, I began investigating all areas of the project. In the following sections of this progress report, you will be informed on the work that I have already accomplished, the work I am now involved in, the work left to do, and finally an overall appraisal of the how the project is going.
Project description. In most progress reports, include a project description to review the details of your project for the recipients:
PROJECT DESCRIPTION Here is a review of the purpose and scope of this project. Purpose. The original investment plan of this corporation included only long-term, low-risk investment in corporate bonds and U.S. securities. This project was designed to answer questions about the potential of short- term, high-dollar investments, particularly those suited to the future expansion of this company's investment plan. Scope. The report will cover basic definitions of stocks and options as well as reasons for and against these two investment strategies. The report will be broken down into four areas:
Conclusion. The final paragraph or section usually reassures audiences that all is going well and on schedule. It can also alert recipients to unexpected changes or problems in the project.
OVERALL APPRAISAL The project to recommend PET production is coming along well. I have not run into any major problems and have found plenty of material on this subject. However, I have not heard from Mr. Simon Juarez of PET Mfg., who is sending information on PET production methods used in several plants in the Southwest. I can foresee no major problems that will keep me from submitting my report to you on the contract date. In fact, I may be able to get it to you a few days earlier than planned. In general, I am finding that the PET bottle is an even more attractive packaging idea than had seemed in our earlier discussions. Full details on this, however, will appear in the final report. Sincerely, Steven C. Crosswell Process Engineer C & S Engineering